Crusher Project
Innovative Solutions
ITAC performed preliminary engineering for site layouts and modifications involving earth work, a retaining wall, conveyors, hoppers, scrubbers, washers, crushers, and electrical and controls to power large equipment. The estimate included the replacement of a crusher, the relocation of a scrubber, modifications to screens and chutes, and overall controls system upgrade. The FEL3 execution plan allows most of the work to be executed with minimal interruptions to existing operations and only one short 24/7 outage. ITAC prepared the IFB packages and is positioning to provide EPC services.