MENU

Tunnels Replacement

Innovative Solutions

For this metals and mining client, ITAC evaluated multiple options for replacement of two 11.5’ diameter 800’ long underground tunnel reclaim systems that have been in service for over 45 years.  The study involved all disciplines including civil, structural, mechanical, process, electrical and instrumentation.  ITAC worked closely with the client to evaluate the total installed capital cost, operational and maintenance cost coupled with operational costs impacts associated with the installation schedules of each of the different options.  ITAC leveraged construction expertise to evaluate and compile construction cost, constructability and overall project schedule.  A detailed and report and estimate was provided for five different concepts, plus various options. ITAC delivered a very thorough FEL2 Report and Estimate that was completed on a tight schedule.

  • CLIENT

    Confidential

  • SITE

    Aurora, North Carolina

  • SERVICES
    • Pre-Project Planning & Scoping
      • FEL 2 Report & Estimate of multiple options for Ore Tunnels Replacement

     

Client Testimonial

ITAC’s construction experience coupled with their engineering resources really adds value on projects like this. They know what it takes to execute the work and I know that I’m getting a solid estimate.” - Confidential Client
ITAC Tunnel Replacement Engineering

Ready to start a conversation?

Contact us Created with Sketch.